Energy & Cleantech

Subsea Pipelines & Cables

Subsea Pipelines & Cables 2026 is a two-day conference held in Trondheim for professionals involved in subsea pipelines, risers, umbilicals, and cables. The event covers topics such as design, installation, operation, new technology solutions, and infrastructure security, featuring technical presentations and networking opportunities.

2 months until it opens.

The essentials

Event details

Dates
13 October 2026 to 14 October 2026
Organiser
Norsk Petroleumsforening
Tickets
NOK 11500 to 13500
Industry
Energy & Cleantech

Agenda themes

Topics covered

  • Power & Energy

On stage

Speakers

  • Per R. NystrømIKM Ocean Design
  • Dr. Venkatapathi TharigopulaEquinor
  • Frode SivertsenVP Project Development, Vår Energi
  • Meric PakkanAker BP
  • Øyvind KoldalPrincipal Facility & Project Engineer, ORLEN Upstream Norway
  • Dian AdistyAker BP
  • Craig Brown
  • Hilde SandstadSURF Manager HPHT portfolio (Atlantis & Linnorm), Equinor
  • Martin StorheimEntail
  • Jan FurnesOKEA
  • Niklas ResmanNKT
  • Markus PerssonNKT
  • Jie WuSINTEF Ocean
  • Nathalie VirgaTechnipFMC
  • Ingrid Alves ValerianoEquinor
  • Malik M. Ibrahim
  • Fraser MurrayGraduate Engineer, TechnipFMC
  • Ed PrattTechnipFMC
  • Bjørn BakkevigProject Manager, Equinor
  • Martin Teigen

Logistics

Where to stay

Places to stay near the venue.

  • Thon Hotel Trondheim

    110 m from the venue

  • Quality Hotel Augustin

    130 m from the venue

  • City Living Schøller hotel

    180 m from the venue

  • Quality Hotel Prinsen

    200 m from the venue

  • Britannia Hotel

    230 m from the venue

  • Comfort Hotel Park

    340 m from the venue

  • City Living Sentrum Hotel & Apartments

    380 m from the venue

  • Astoria

    420 m from the venue

Plan this event

Work out who to meet here

Luminik sources the attendee picture for an event like Subsea Pipelines & Cables, enriches it against your ICP, and sequences it ahead of the date. Capture at the event writes to Salesforce or HubSpot the same day, and attribution ties the pipeline back to the spend.

Spot something wrong on this page? Report a correction and we will fix it.